ID 1.1 Preliminary Rating - Platinum
ID 1.2 Integrated Project Team
ID 1.3. Professional Credentialed with LEED
ID 2.3 Third Party Durability Management Verification
ID 3.1 Innovation: Exemplary Photovoltaic Solar
ID 3.2 Innovation: Edible Garden
Required
1 point
0 points
1 point
Required
Required
3 points
1 point
1 point
1 point
1 point
LL 2a: Built Above the 100 year Flood Plain
LL 2c: Not Built Within 100ft. of Water, Including Wetlands
2 points
inc. above
inc. above
inc. above
2 points
1 point
1 point
SS 1.1 Erosion Controls During Construction
SS 1.2 Minimize Disturbed Area of Site
SS 2.3 Limit Convential Turf - No turf in landscape design
SS 2.4 Drought Tolerant Plants - All non-edible plants are drought tolerant
SS 3.0 Reduce Local Heat Island Effects - Light colored, high albedo material for 50% of hardscapes
SS 4.2 Permanent Erosion Controls
Required
1 point
Required
2 points
3 points
2 points
1 point
3 points
1 point
1 point
2 points
3 points
1 point
1 point
EA 1.1 Performance of ENERGY STAR for Homes
EA 1.2 Exception Energy Performance - 51.4% above Title 24
EA 8.3 Advanced Lighting Package - LED lighting throughout home
EA 9.1 High Efficiency Appliances
EA 10 Renewable Energy System - Photovoltaic Solar System
EA 11.1 Refrigerant Recharge Test
EA 11.2 Residential Refrigerant Management - Non-HCFC refrigerants used
Required
18 points
Required
3 points
1.5 points
10 points
Required
1 point
MR 1.1 Framing Order Waste Factor
MR 2.1 FSC Certified Tropical Wood
MR 2.2 Environmentally Preferable Products
Required
Required
6 points
Required
0.5 points
EQ 2.1 Combustion Venting Measures
EQ 2.2 Enhanced Combustion Venting Measures
EQ 4.2a Enhanced Outdoor Air Ventilation - Continuously Operating Fan
EQ 4.3 Third Party Performance Testing
EQ 5.2d Enhanced Local Exhaust
EQ 5.3 Third Party Performance Testing
EQ 6.3 Third Party Performance Test
EQ 8.1 Indoor Contaminant Control During Construction
EQ 8.2b Shoe Storage Near Primary Entries
EQ 8.2c Central Vacuum System Exhaust to Outdoors
Required
1 point
Required
2 points
1 point
Required
1 point
1 point
Required
2 points
Required
1 point
1 point
1 point
1 point
Required
2 points
1 point
AE 1.1 Basic Operation Training
AE 1.3a Slab Party - May 23, 2010
AE 1.3a Architects & Builders Tour - August 4, 2010
Required
1 point
1 point
inc. above
inc. above
inc. above
inc. above